网上预订 :
抵达日期
入住天数
即刻预订

SINGAPORE CHANGI AIRPORT SKYTRAIN REDEVELOPMENT WORKS


选择目的地:

Singapore Changi Airport Skytrain Redevelopment Works

As a result of redevelopment works at Terminal 1, the North Skytrain line connecting Terminals 2 and 3 – including the public area service, and the transit area service between Terminal 3 (B Gates) & Terminal 2 (E Gates) – which runs through the development site, are closed during the period of construction. The South Skytrain line connecting Terminal 3 (A Gates) and Terminal 2 (F Gates) remains operational.

For more details, click here 

 

Imager Credits : Singapore Changi Airport